Projects : 1- Arafat II Substation (110/13.8 KV) (Makkah)
2- AL-Shatea Substation(110/13.8KV) (Jeddah)
3- AL-Sharaia Substation(110/13.8KV) (Makkah)
4) Al Raidah project Jeddah
5) Thuwal Substation (110/13.8KV) Jeddah
Client : National Grid, KSA
Company : Advanced Energy Company (AECC), Concern of “MASCO”, KSA
PROJECT INTRO:-
The project consists of Multistoried building for installation of Electrical Substation (110/13.8 KV),
comprising of all the civil and infrastructure works.
RESPONSIBILITIES:-
Supervise all the construction activities that take place on specific work site.
Supervise day to day building operations including leading & managing crew on specific construction
tasks.
Layout as per drawing.
Preparation of Daily Progress Reports
Supervision of Concrete works (Mixing, Poring, Placing and finishing).
which includes :-
False ceiling
Raised floor
Epoxy paints
Wall paints
Gypsum board fixing
Plastering
Block Work
Public Health Work
External Finishing
Water proofing & Protection of buildings.
Sewerage, Roads, Precast panels boundary walls.
Supervision of Form work & Steel works.
Work as per Construction Schedule according to the Guidelines & Directions of the Construction Manager
/ Engineer.
• Project : Construction of Residential Colony for the Employees of B.I.S.E,Abbottabad,Pakistan
Client : Board of Intermediate & Secondary Education Abbottabad, Pakistan
Company : M/S Budi-Uz-Zaman & Co.
PROJECT INTRO:-
This project comprises of Rehabilitation / Improvement of Residential Colony for the Employees of
B.I.S.E, Abbottabad including Drainage & Sewerage Pipeline systems, Road works, Electrical ,Civil Works.
RESPONSIBILITIES:-
Correspondence with Client " Board of Intermediate & Secondary Education Abbottabad, Pakistan.
Checking of all Civil works ( Layout Excavations & Leveling , Concrete , Steel ,Shuttering, brick masonry
Plaster, Plumbing work ,Tiles , Marble etc.
Checking Measuring & Quantities of Contractor Bills .
Checking Supervise the Quality & Quantity of Concrete.
To check Steel Bar binding Schedule.
Checking Daily Progress Report.
Checking Monthly Progress Report.
Site Inspections, Daily work progress reviews and Next day planning
Project : Construction of 309 Middle Schools in District of Azad Jammu & Kashmir
( Muzaffarabad , Neelum , Bagh & Poonch ) in Earthquake affected area.
Client : Earthquake Emergency Assistance Project (EEAP)
Consultant : NESPAK National Engineering Services Pakistan (Pvt). Ltd
Owner : ADB funded (Asian Development Bank)
Company : M/s Shah zaman PEB-JV
PROJECT INTRO:-
Light Gauge Cold Formed Galvanized Steel Structure design for Earthquake- Resistance Building.
RESPONSIBILITIES:-
Project coordination with the consultants
Guiding contractor to remove defects at site.
Visited all site & Cheeked all civil activity
Construction Supervision
To check Quality of steel Bars used in plinth Beam & Grade slab.
PROJECTS:-
1)Construction of 02 middle Schools in Balakot Pakistan in Earthquake
affected area 06 Class room , office room, kitchen, store & Toilet block
Structural design, Frame structure
2)Construction of 01 Primary Schools in Buzbeela Pakistan in
Earthquake affected area. 02 Class room , office room , store , Toilet block
Client : SDC (Swiss Agency for Development & Corporation)
Consultant: : UET Consultancy Cell Peshawar Pakistan
Company : M/S Abdul Sattar
PROJECT INTRO:-
Construction of Primary School & Middle School in Earthquake affected area. Balakot,Buzbeela Pakistan
RESPONSIBILITIES:-
Worked as Construction Site Supervisor, responsible for all kind of Finishing including, plastering, tiling,
painting and false ceiling, opening fixation.
Coordination with Consultants and Clients regarding the site related activities.
Supervise all the construction activities that take place on specific work site.
Supervise day to day building operations including leading & managing crew on specific construction
tasks.
Monitoring the work to ensure the safety and quality
To arrange the materials as per site requirement.
Layout as per drawing.
To prepare bills of Sub contractor
Supervision of Concrete works (Mixing, Poring, Placing and finishing).
which includes :-
False ceiling
Wall paints
Plastering
Bricks Work
Public Health Work
External Finishing
Supervision of Form work & Steel work according to drawing.
Work as per Construction Schedule according to the Guidelines & Directions of the Construction
Manager
Project : Fast National University H-11/4 Islamabad Pakistan
Client : Fast National University Islamabad
Company : Capital Contractor , Engineering Contractor Islamabad ,Pakistan
PROJECT INTRO:-
This project consists of construction and rehabilitation of Fast National University Structural design,
Frame structure,
Total area of University = 36000 SFT
RESPONSIBILITIES:-
Worked as Construction Site Supervisor, responsible for all kind of Finishing including, plastering,
tiling, painting and false ceiling, opening fixation.
Coordination with Consultants and Clients regarding the site related activities.
Check all Level as per Drawing with instrument
Supervision of Form work & Steel work according to drawing.
Layout as per drawing.
Supervision of Concrete works (Mixing, Poring, Placing & Finishing)
including :-
False ceiling
Raised floor
Marble floor
Wall paints
Plastering
Bricks Work
Door Frame
Internal Finishing
External Finishing
Water proofing & Protection of buildings.
Project : Executive Lodges phase III , Office building , Safari Villas-III Islamabad Pakistan
Client : Bahria Town (Pvt). Ltd Rawalpindi / Islamabad, Pakistan
Company : Bahria Town (Pvt). Ltd Rawalpindi / Islamabad, Pakistan
PROJECT INTRO:-
Construction of Houses in Executive Lodges phase iii , Office building , Safari Villas-iii Bahria Town
Rawalpindi/Islamabad Pakistan
G+1..........60 Houses (05 Marla)
30 Houses (10 Marla)
40 Houses (01 Canal)
Versace’s design
G+1..........01 No Office building
Various design , Structural design
RESPONSIBILITIES:-
Worked as Construction Site Supervisor, responsible for all kind of Finishing including, plastering, tiling,
painting and false ceiling, opening fixation.
Inspection for sites of different construction Phases
Check all Level as per Drawing with instrument
Layout as per drawing.
To check proper curing of all concrete works
Preparation of Bar Bending Schedules
Supervision of Form work & Steel work according to drawing.
Supervision of Concrete works (Mixing, Poring, Placing & Finishing)
including :-
False ceiling
Raised floor
Marble floor
Wall paints
Plastering
Bricks Work
Door Frame
Internal Finishing
External Finishing