- Prepare the materials from the designer packages.
- Issue TQ for wrong measurement on the drawings.
- Marking redlines for missing materials.
- Inspect Material on site.
- basic knowlage of hydro testing for valves.
- well known of Aramco Standards, Procedures, material spec, etc.