Architect Engineer with 5 years of experience in architecture design and site observing during construction. I am very good with the design especially in architectural working drawings, architecture showing programs such revit& sketchup, and sheet presentations before and after print.
I am working now as a site engineer at the housing project of Jolmoudah district for "RCJY" and Al-Fadhely gas project, to understand how the design that I have done through the last three years is working on the site and get more in it.
<div>
<p> My Duties: I work with a group of Engineers headed by Construction Manager;</p>
<p> I observe the work of the site and verify that it is compatible with what is present in the architectural drawings, based on the client's standards and specifications. Inspecting the buildings walls, doors, windows, floors, and suspended floors and roofs daily with the requirements of Aramco standards and codes.</p>
<p> Coordinate with the civil engineer the time of concrete casting, with going to the factory and prepare the sheets of paying.</p>
<p> Check the labors attendance, distribute their duties daily, and contact them about the latest materials that construction is needed that which the work is based on it and the engineering office recommendations.</p>
</div>
My Duties:
Site Inventory and Analysis (Site Visit).
Design, Projects Presentation, Contract Document Drawings, Supervisor the Architectural
Aspects.
Prepare sessions to discuss the project with the client.
The Projects:
Al-Joaib Tower (Submitted but Under Construction) and other Private Projects.
Al-Riyadh Tunnels. (Submitted).
Anaam City (Cattle Market). (Submitted).
Industrial Wastewater Treatment Ras Al-Khair Industrial City Station. (Still in Design
process).
Housing. (Submitted).
we as group of college of architecture and planning "15 students" design the whole tourism project and we have build it in front of the main gate of university of dammam.--the group was devided into numbers of specialist: architecture/ landscaping/ interior and building technology departments. The built building was in a tradditional design. --it was built by only mud with some treated materials.--and we have finished building it in approxmetly 3 months/ 8 hours working each day.